Software Quality Assurance

engineering processes, methods, activities, and work items are monitored and comply with the defined standards. These defined standards could be one or a combination of any like ISO 9000, CMMI model, ISO15504, etc. With a prime goal is to ensure quality.
Service

Software Quality Assurance

The Team and CHART provide following documents while engaging the client including the Quality and Software Development teams as a part of the overall Software Quality Assurance engagement.
• Software Quality Assurance Plan abbreviated as SQAP, the software quality assurance plan comprises the procedures, techniques, and tools that are employed to make sure that a product or service aligns with the requirements defined in the SRS (software requirement specification).
Software Quality Assurance Techniques are the various technical interventions applied and employed by the team during the course of the engagement in order to achieve the stated goal. Auditing is the chief technique that is widely adopted. However, there are a few other significant techniques as well.
• Software Quality Assurance Activities are the planned activities taken up by the team under the guidance of the PM are provided below as a list.
1. Creating an SQA Management Plan
2. Setting the Checkpoints:
3. Apply software Engineering Techniques:
4. Executing Formal Technical Reviews
5. Having a Multi-Testing Strategy
6. Enforcing Process Adherence
7. Controlling Change
8. Measure Change Impact
9. Performing SQA Audits
10. Maintaining Records and Reports
11. Manage Good Relations
  • The SQA plan document consists of the below sections:
    1. Purpose section
    2. Reference section
    3. Software configuration management section
    4. Problem reporting and corrective
    action section.
    5. Tools, technologies, and
    methodologies section
    6. Code control section
    7. Records: Collection, maintenance,
    and retention section
    8. Testing methodology